Black Sea Coast Road, Arakli-Iyidere

Black Sea Coast Road, Arakli-Iyidere

 

Project Location Trabzon / TURKEY
Employer TR General Directorate of Highways (KGM)
The name of the job Araklı – Iyidere Road Km: 80+220 – 107+135 “Leveling, Engineering Structures, Bridge, Tunnel, Sub-base, Plantmix Foundation and Bituminous Hot Mix etc” Works.
Total Contract Price 174,659,948.10 USD
Type of Work Done
Total Path Length 27 km, 2 x 2 Lane Excavation 3.725.050 m³
Filling 3.087.000 m³ Coastal Fortification 8,356,250 tons
Earth Retaining Walls 58,072 m² Retaining Walls 5,874 m
Sub-Base 438,000 tons Base Layer 453,000 tons
Asphalt Paving 761,000 tons Asphalt Wear Layer 806,000 m²
Number of Bridges 26, Length = 3,405 m Number of Tunnels 1, Length = 574 m
Number of Overpasses 2 Number of Underpasses 8, Length = 531 m
Number of Prefabricated Beams 1801 Number of Box and Pipe Grilles 141, Length = 8.193 m
Concrete 185,000 m³ Pile Works 21,749 m

 