Istanbul Otogar-Bağcılar Rail Public Transportation System Construction, Electro-Mechanical Works and Vehicle Supply |
|||
Project Location | Istanbul Turkey | ||
Employer | Istanbul Metropolitan Municipality, General Directorate of IETT | ||
The name of the job | Istanbul Bus Terminal-Bağcılar Rail Public Transportation System Construction, Electro-Mechanical Works and Vehicle Supply |
||
Total Contract Price | 1,355,277,095.16 USD | ||
Type of Work Done | |||
Tunnel Length | 26.234 m – EPB – CPC | Number of Stations | 16 ( 5 Stations were built with Diaphragm Wall and Top-Down Construction Method.) |
3,740 m – NATM | Earthworks | 5.888.513 m³ – Excavation | |
909 m – 2 Viaducts | 2,069,000 m³ – Fill | ||
2.195 m – Open & Close | Shoring Works | 139,060 m² – Diaphragm Wall | |
46,000 m – Single Line Length | 35.423 m³ – Shotcrete | ||
Tunnel Diameter | TBM – 6.50 m | 149,058 m – Bored Pile | |
NATM – 7.80m | 700,553 m – Anchor | ||
segment | 18,995 Rings (5 Panels + 1 Switch) | Concrete | 914,788 m³ |