Kömürhan Bridge Connection Tunnel and Road

Kömürhan Bridge Connection Tunnel and Road

 

Project Location Malatya-Elazig / TURKEY
Employer TR General Directorate of Highways (KGM)
The name of the job Kömürhan Bridge Connection Tunnel and Road construction work
Total Contract Price 185,346,779,30 TRY
Type of Work Done
Total Path Length 5.2 km, Width = 23 m Bituminous Coating 3,795 tons
Excavation 1.175.000 m³ Binder Layer 3,795 tons
Tunnel Excavation 440,000 m³ Wear Layer 111,857 m²
Filling 500,000 m³ Concrete 160.000 m³
Plant Mix Subbase 50,189 tons Bridge 660 m, Width 23.86 m
Base Layer 65,486 tons Tunnel (NATM) 2 x 2.400 = 4.800 m, Diameter = 5.30 m

 