Mavi Tünel Potable Water Treatment Plants and Transmission Pipeline

Blue Tunnel Drinking Water Treatment Plants and Transmission Line

 

Project Location Konya / TURKEY
Employer General Directorate of State Hydraulic Works (DSI)
The name of the job Blue Tunnel Drinking Water Treatment Plants and Transmission Line
Total Contract Price 38.250.000.00 TRY
Type of Work Done
Unit 32 Pieces
Total Line Length 59,014 m
Reinforced Concrete Bridge 148 m (1 unit)
Excavation 485.000 m³
Concrete 20.750 m³
reinforcement 1,507 tons

 