Üsküdar-Ümraniye-Çekmeköy Metro Construction and Electromechanical Works

 

Üsküdar-Ümraniye-Çekmeköy Metro Construction and Electromechanical Works

Project LocationIstanbul / TURKEY
EmployerIstanbul Metropolitan Municipality, Anatolian Side Rail System Directorate
Name of the JobÜsküdar-Ümraniye-Çekmeköy Metro Construction and Electromechanical Works
Total Contract Price676,621,041.96 EUR
Type of Work Done
Tunnel Length26.985 m – EPB – TBMNumber of Stations16 (including 5 top-down stations)
18.666 m – NATMEarthworks2.171.605,97 m³ – Stations and Storage Area Excavation
1,454,009.76 m³ – NATM Excavation
Single Line Length53.106 m914.712 m³ – TBM Excavation
Tunnel DiameterTBM – 6.56 m745.782,82 m³ – Filling
Train Temporary Storage Area180 hectares – Fully Equipped Maintenance Area
14.000 m² – Workshop
Shoring Works138.767,76 m² – Shoring
31.872,61 m – Bored Pile
SectionTBM – Circular

NATM – Horseshoe

705.602 m – Anchor
Concrete1.289.944 m³

 

Other Documents
No results found.