Üsküdar-Ümraniye-Çekmeköy Metro Construction and Electromechanical Works

 

Üsküdar-Ümraniye-Çekmeköy Metro Construction and Electromechanical Works

Project Location Istanbul / TURKEY
Employer Istanbul Metropolitan Municipality, Anatolian Side Rail System Directorate
Name of the Job Üsküdar-Ümraniye-Çekmeköy Metro Construction and Electromechanical Works
Total Contract Price 676,621,041.96 EUR
Type of Work Done
Tunnel Length 26.985 m – EPB – TBM Number of Stations 16 (including 5 top-down stations)
18.666 m – NATM Earthworks 2.171.605,97 m³ – Stations and Storage Area Excavation
1,454,009.76 m³ – NATM Excavation
Single Line Length 53.106 m 914.712 m³ – TBM Excavation
Tunnel Diameter TBM – 6.56 m 745.782,82 m³ – Filling
Train Temporary Storage Area 180 hectares – Fully Equipped Maintenance Area
14.000 m² – Workshop
Shoring Works 138.767,76 m² – Shoring
31.872,61 m – Bored Pile
Section TBM – Circular

NATM – Horseshoe

705.602 m – Anchor
Concrete 1.289.944 m³

 