| Kömürhan Bridge Connection Tunnel and Road |
| Project Location | Malatya-Elazig / TURKEY |
| Employer | TR General Directorate of Highways (KGM) |
| The name of the job | Kömürhan Bridge Connection Tunnel and Road construction work |
| Total Contract Price | 185,346,779,30 TRY |
| Type of Work Done |
| Total Path Length | 5.2 km, Width = 23 m | Bituminous Coating | 3,795 tons |
| Excavation | 1.175.000 m³ | Binder Layer | 3,795 tons |
| Tunnel Excavation | 440,000 m³ | Wear Layer | 111,857 m² |
| Filling | 500,000 m³ | Concrete | 160.000 m³ |
| Plant Mix Subbase | 50,189 tons | Bridge | 660 m, Width 23.86 m |
| Base Layer | 65,486 tons | Tunnel (NATM) | 2 x 2.400 = 4.800 m, Diameter = 5.30 m |