Turkey, Mersin – Akkuyu NPP Project – Construction and Assembly Works

Infrastructure

Project Information

Akkuyu, Mersin
Akkuyu Nükleer A.Ş. (Rosatom)
TITAN2 IC İçtaş İnşaat A.Ş.
25 Month
96.2 M$

Project Details

– Construction, Electrical, Equipment Assembly, Mechanical, Insulation, Painting, and Building works of the outlet structures (channel and siphon) of the cooling system for the four reactors within the Akkuyu NPP Project.
– A total of four channels, each 2250m in length
– Four siphon structures
– Construction, Electrical, Equipment Assembly, Mechanical, Insulation, Painting, and Building works for 17 different buildings within the Akkuyu NPP Project.
– A total of 119,200 m³ of Concrete
– A total of 20,300 tons of Iron