Western Blacksea Phase 2 Naturalgas Pipeline Project

Infrastructure

Project Information

Zonguldak ve Düzce
BOTAŞ
AHM &Talu İnşaat JV (%50-%50)
660 Days
515.000.000,00 TRY

Project Details

General Information:
• Approximately 89.223m (inclined) long 48” Radius naturalgas steel pipe line system,
• 2 linevalve stations,
• 2 take-off valve stations,
• 1 pig reciever
• 1 pig exhauster station
• 1 line valve material supply and construction works