Western Blacksea Phase 3 NaturalGas Pipeline Project

Infrastructure

Project Information

Zonguldak ve Düzce
BOTAŞ
AHM &Talu İnşaat JV (%50-%50)
660 Days
509.999.999 TRY

Project Details

General Information:
• Approximately 86.156m (inclined) long 48” Radius
• Natural gas steel pipe line system
• 2 line valve stations
• 1 pig reciever stations
• 1 hot-tap valve
• 1 line valve material supply and construction works