{"id":603,"date":"2022-06-08T10:19:51","date_gmt":"2022-06-08T10:19:51","guid":{"rendered":"https:\/\/taluinsaat.com\/?post_type=isdeneyim&#038;p=603"},"modified":"2023-11-06T14:47:40","modified_gmt":"2023-11-06T14:47:40","slug":"black-sea-coast-road-arakli-iyidere","status":"publish","type":"isdeneyim","link":"https:\/\/taluinsaat.com\/?isdeneyim=black-sea-coast-road-arakli-iyidere&lang=en","title":{"rendered":"Black Sea Coast Road, Arakli-Iyidere"},"content":{"rendered":"<table width=\"1084\">\n<tbody class=\"responsive_table\">\n<tr>\n<td colspan=\"4\" width=\"1084\" data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Black Sea Coast Road, Arakli-Iyidere<\/strong><\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Project Location<\/strong><\/td>\n<td colspan=\"3\" data-th=\"undefined\">Trabzon \/ TURKEY<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Employer<\/strong><\/td>\n<td colspan=\"3\" data-th=\"undefined\">TR General Directorate of Highways (KGM)<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>The name of the job<\/strong><\/td>\n<td colspan=\"3\" width=\"688\" data-th=\"undefined\">Arakl\u0131 \u2013 Iyidere Road Km: 80+220 \u2013 107+135 \u201cLeveling, Engineering Structures, Bridge, Tunnel, Sub-base, Plantmix Foundation and Bituminous Hot Mix etc\u201d Works.<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Total Contract Price<\/strong><\/td>\n<td colspan=\"3\" data-th=\"undefined\">174,659,948.10 USD<\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Type of Work Done<\/strong><\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Total Path Length<\/strong><\/td>\n<td data-th=\"undefined\">27 km, 2 x 2 Lane<\/td>\n<td data-th=\"undefined\"><strong>Excavation<\/strong><\/td>\n<td data-th=\"undefined\">3.725.050 m\u00b3<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Filling<\/strong><\/td>\n<td data-th=\"undefined\">3.087.000 m\u00b3<\/td>\n<td data-th=\"undefined\"><strong>Coastal Fortification<\/strong><\/td>\n<td data-th=\"undefined\">8,356,250 tons<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Earth Retaining Walls<\/strong><\/td>\n<td data-th=\"undefined\">58,072 m\u00b2<\/td>\n<td data-th=\"undefined\"><strong>Retaining Walls<\/strong><\/td>\n<td data-th=\"undefined\">5,874 m<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Sub-Base<\/strong><\/td>\n<td data-th=\"undefined\">438,000 tons<\/td>\n<td data-th=\"undefined\"><strong>Base Layer<\/strong><\/td>\n<td data-th=\"undefined\">453,000 tons<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Asphalt Paving<\/strong><\/td>\n<td data-th=\"undefined\">761,000 tons<\/td>\n<td data-th=\"undefined\"><strong>Asphalt Wear Layer<\/strong><\/td>\n<td data-th=\"undefined\">806,000 m\u00b2<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Number of Bridges<\/strong><\/td>\n<td data-th=\"undefined\">26, Length = 3,405 m<\/td>\n<td data-th=\"undefined\"><strong>Number of Tunnels<\/strong><\/td>\n<td data-th=\"undefined\">1, Length = 574 m<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Number of Overpasses<\/strong><\/td>\n<td data-th=\"undefined\">2<\/td>\n<td data-th=\"undefined\"><strong>Number of Underpasses<\/strong><\/td>\n<td data-th=\"undefined\">8, Length = 531 m<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Number of Prefabricated Beams<\/strong><\/td>\n<td data-th=\"undefined\">1801<\/td>\n<td data-th=\"undefined\"><strong>Number of Box and Pipe Grilles<\/strong><\/td>\n<td data-th=\"undefined\">141, Length = 8.193 m<\/td>\n<\/tr>\n<tr>\n<td data-th=\"Karadeniz Sahil Yolu, Arakl\u0131-\u0130yidere\"><strong>Concrete<\/strong><\/td>\n<td data-th=\"undefined\">185,000 m\u00b3<\/td>\n<td data-th=\"undefined\"><strong>Pile Works<\/strong><\/td>\n<td data-th=\"undefined\">21,749 m<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"featured_media":903,"template":"","isdeneyimkat":[49],"class_list":["post-603","isdeneyim","type-isdeneyim","status-publish","has-post-thumbnail","hentry","isdeneyimkat-general"],"acf":[],"_links":{"self":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/isdeneyim\/603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/isdeneyim"}],"about":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/types\/isdeneyim"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/media\/903"}],"wp:attachment":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=603"}],"wp:term":[{"taxonomy":"isdeneyimkat","embeddable":true,"href":"https:\/\/taluinsaat.com\/index.php?rest_route=%2Fwp%2Fv2%2Fisdeneyimkat&post=603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}