{"id":661,"date":"2022-06-08T23:52:00","date_gmt":"2022-06-08T23:52:00","guid":{"rendered":"https:\/\/taluinsaat.com\/?post_type=isdeneyim&#038;p=661"},"modified":"2023-11-06T14:52:27","modified_gmt":"2023-11-06T14:52:27","slug":"sinop-boyabat-tunnel-passage-road","status":"publish","type":"isdeneyim","link":"https:\/\/taluinsaat.com\/?isdeneyim=sinop-boyabat-tunnel-passage-road&lang=en","title":{"rendered":"Sinop \u2013 Boyabat (Tunnel Passage) Road"},"content":{"rendered":"<table width=\"1084\">\n<tbody>\n<tr>\n<td colspan=\"4\" width=\"1084\"><strong>Sinop-Boyabat (Tunnel Crossing) Road<\/strong><\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td><strong>Project Location<\/strong><\/td>\n<td colspan=\"3\">Sinop\/Turkey<\/td>\n<\/tr>\n<tr>\n<td><strong>Employer<\/strong><\/td>\n<td colspan=\"3\">TC GENERAL DIRECTORATE OF HIGHWAYS<\/td>\n<\/tr>\n<tr>\n<td><strong>The name of the job<\/strong><\/td>\n<td colspan=\"3\" width=\"688\">Sinop-Boyabat (Tunnel Crossing) Road Km Between 0+000-54+463<\/td>\n<\/tr>\n<tr>\n<td><strong>Total Contract Price<\/strong><\/td>\n<td colspan=\"3\">130,993,800,91 USD<\/td>\n<\/tr>\n<tr>\n<td><strong>Work Experience Certificate<\/strong><\/td>\n<td colspan=\"3\"><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\"><strong>Type of Work Done<\/strong><\/td>\n<\/tr>\n<tr>\n<td><strong>Earthworks<\/strong><\/td>\n<td>433,895,540.77 USD<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><strong>Art structures<\/strong><\/td>\n<td>40,426,788.52 USD<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><strong>Superstructure Works<\/strong><\/td>\n<td>13,064,624.57 USD<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><strong>Miscellaneous Jobs<\/strong><\/td>\n<td>3,548,955.94 USD<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><strong>Bridge Works<\/strong><\/td>\n<td>$2,055,670.14 USD<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><strong>Tunnel Works<\/strong><\/td>\n<td>15,210,877.78 USD<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td width=\"396\"><strong>Secondary Works (ENH Displacement)<\/strong><\/td>\n<td>70,127.01 USD<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td width=\"396\"><strong>Secondary Works (Tunnel Electrical Electromechanical Works)<\/strong><\/td>\n<td>12,721,216.18 USD<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"featured_media":906,"template":"","isdeneyimkat":[],"class_list":["post-661","isdeneyim","type-isdeneyim","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/isdeneyim\/661","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/isdeneyim"}],"about":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/types\/isdeneyim"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/media\/906"}],"wp:attachment":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=661"}],"wp:term":[{"taxonomy":"isdeneyimkat","embeddable":true,"href":"https:\/\/taluinsaat.com\/index.php?rest_route=%2Fwp%2Fv2%2Fisdeneyimkat&post=661"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}