{"id":665,"date":"2022-06-08T23:58:44","date_gmt":"2022-06-08T23:58:44","guid":{"rendered":"https:\/\/taluinsaat.com\/?post_type=isdeneyim&#038;p=665"},"modified":"2023-11-06T14:48:31","modified_gmt":"2023-11-06T14:48:31","slug":"istanbul-bus-terminal-bagcilar-rail-system-construction-and-electro-mechanical-works","status":"publish","type":"isdeneyim","link":"https:\/\/taluinsaat.com\/?isdeneyim=istanbul-bus-terminal-bagcilar-rail-system-construction-and-electro-mechanical-works&lang=en","title":{"rendered":"Istanbul Bus Terminal \u2013 Ba\u011fc\u0131lar Rail System Construction and Electro-Mechanical Works"},"content":{"rendered":"<table width=\"1084\">\n<tbody class=\"responsive_table\">\n<tr>\n<td colspan=\"4\" width=\"1084\" data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\"><strong>Istanbul Otogar-Ba\u011fc\u0131lar Rail Public Transportation System Construction, Electro-Mechanical<\/strong><br \/>\n<strong>Works and Vehicle Supply<\/strong>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\"><strong>Project Location<\/strong><\/td>\n<td colspan=\"3\" data-th=\"undefined\">Istanbul Turkey<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\"><strong>Employer<\/strong><\/td>\n<td colspan=\"3\" data-th=\"undefined\">Istanbul Metropolitan Municipality, General Directorate of IETT<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\"><strong>The name of the job<\/strong><\/td>\n<td colspan=\"3\" width=\"688\" data-th=\"undefined\">Istanbul Bus Terminal-Ba\u011fc\u0131lar Rail Public Transportation System Construction, Electro-Mechanical<br \/>\nWorks and Vehicle Supply<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\"><strong>Total Contract Price<\/strong><\/td>\n<td colspan=\"3\" data-th=\"undefined\">1,355,277,095.16 USD<\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\"><strong>Type of Work Done<\/strong><\/td>\n<\/tr>\n<tr>\n<td rowspan=\"5\" data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\"><strong>Tunnel Length<\/strong><\/td>\n<td data-th=\"undefined\">26.234 m \u2013 EPB \u2013 CPC<\/td>\n<td data-th=\"undefined\"><strong>Number of Stations<\/strong><\/td>\n<td width=\"247\" data-th=\"undefined\">16 ( 5 Stations were built with\u00a0Diaphragm<br \/>\nWall and Top-Down Construction Method.)<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\">3,740 m &#8211; NATM<\/td>\n<td rowspan=\"2\" data-th=\"undefined\"><strong>Earthworks<\/strong><\/td>\n<td data-th=\"undefined\">5.888.513 m\u00b3 \u2013 Excavation<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\">909 m \u2013 2 Viaducts<\/td>\n<td data-th=\"undefined\">2,069,000 m\u00b3 \u2013 Fill<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\">2.195 m \u2013 Open &amp; Close<\/td>\n<td rowspan=\"4\" data-th=\"undefined\"><strong>Shoring Works<\/strong><\/td>\n<td data-th=\"undefined\">139,060 m\u00b2 \u2013 Diaphragm Wall<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\">46,000 m \u2013 Single Line Length<\/td>\n<td data-th=\"undefined\">35.423 m\u00b3 \u2013 Shotcrete<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\"><strong>Tunnel Diameter<\/strong><\/td>\n<td data-th=\"undefined\">TBM \u2013 6.50 m<\/td>\n<td data-th=\"undefined\">149,058 m \u2013 Bored Pile<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\">NATM \u2013 7.80m<\/td>\n<td data-th=\"undefined\">700,553 m \u2013 Anchor<\/td>\n<\/tr>\n<tr>\n<td data-th=\"\u0130stanbul Otogar-Ba\u011fc\u0131lar Rayl\u0131 Toplu Ta\u015f\u0131ma Sistemi \u0130n\u015faat,Elektro-Mekanik\u0130\u015flerinin Yap\u0131m\u0131 ve Ara\u00e7 Temini\"><strong>segment<\/strong><\/td>\n<td data-th=\"undefined\">18,995 Rings (5 Panels + 1 Switch)<\/td>\n<td data-th=\"undefined\"><strong>Concrete<\/strong><\/td>\n<td data-th=\"undefined\">914,788 m\u00b3<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"featured_media":910,"template":"","isdeneyimkat":[],"class_list":["post-665","isdeneyim","type-isdeneyim","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/isdeneyim\/665","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/isdeneyim"}],"about":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/types\/isdeneyim"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/taluinsaat.com\/index.php?rest_route=\/wp\/v2\/media\/910"}],"wp:attachment":[{"href":"https:\/\/taluinsaat.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=665"}],"wp:term":[{"taxonomy":"isdeneyimkat","embeddable":true,"href":"https:\/\/taluinsaat.com\/index.php?rest_route=%2Fwp%2Fv2%2Fisdeneyimkat&post=665"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}