Guided Irrigation Main Canal Part 1
|
|||
Project Location | Kahramanmaras / TURKEY | ||
Employer | General Directorate of State Hydraulic Works (DSI) | ||
The name of the job | Guided Irrigation Main Canal Part 1 | ||
Total Contract Price | 206,903,684.28 TRY | ||
Type of Work Done | |||
Main Transmission Channel | 46.83 km | Sand-Gravel Laying | 335.900 m³ |
Conventional Tunnel | Length = 500 m, Diameter = 7 m | Geotextile Laying | 1.150.000 m² |
CPC Tunnel | Length = 5,450 m, Diameter = 6 m | Channel Coating Concrete | 171,750 m³ |
Girdle Channel | 24 pieces, Length = 32,821 m | Art Structure Concrete | 87,014 m³ |
Open Excavation | 25.8 million m³ | Reinforced Concrete Iron | 3,550 tons |